Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"
From GlueXWiki
(→Thursday, February 15) |
(→Thursday, February 15) |
||
Line 16: | Line 16: | ||
#* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study] | #* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study] | ||
#* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change] | #* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change] | ||
− | #* Sergey and the DAQ group high intensity studies | + | #* Sergey and the DAQ group high intensity studies |
# Issues: | # Issues: | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
# Reports (?): | # Reports (?): | ||
# Standing issues: | # Standing issues: |
Revision as of 23:22, 14 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change
- Sergey and the DAQ group high intensity studies
- Controlled Access
- Issues:
- Today's run plan Google Calendar:
- Reports (?):
- Standing issues: