Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Wednesday, February 21)
 
(19 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Wednesday, February 21 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* CDC threshold runs (standard & 2016 higher thresholds)
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3535225 AD00C XPOS drift] [https://logbooks.jlab.org/entry/3535254 due to beam energy fluctuation (HALLD:p)] [https://logbooks.jlab.org/entry/3535308 Oscillations in AD00C Y pos and CDC current too] [https://logbooks.jlab.org/entry/3535511 Frequent excursions overnight]
 +
#* [https://logbooks.jlab.org/entry/3535285 Possible active target problem]
 +
#* [https://logbooks.jlab.org/entry/3535578 Stuck PS coincidence rate]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3535587 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Controlled access while down for tour
 +
#* Zisis takes over as RC in the afternoon
 +
#* Harp scan once beam returns
 +
#* Production data
 +
 +
== Tuesday, February 20 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator still has high RF trip rate
 +
#* [https://logbooks.jlab.org/entry/3534435 FMWPC investigations] [https://logbooks.jlab.org/entry/3534461 2]
 +
#* [https://logbooks.jlab.org/entry/3534448 FCAL base replacements]
 +
#* [https://logbooks.jlab.org/entry/3534471 TAGM replacement preamp]
 +
#* [https://logbooks.jlab.org/entry/3534542 ActiveMQ]
 +
#* [https://logbooks.jlab.org/entry/3534592 Monitoring hists updated]
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3534655 DAQ issues] [https://logbooks.jlab.org/entry/3534724 2]
 +
#* [https://logbooks.jlab.org/entry/3534930 Small timing shift]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3534994 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Production
 +
#* VL or VVL intensity?
 +
#* Current scans?
 +
#* Tomorrow we will be down for a tour
 +
 +
== Monday, February 19 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3534028 DAQ disconnect]
 +
#* [https://logbooks.jlab.org/entry/3534100 TOF crate] [https://logbooks.jlab.org/entry/3534102 2] [https://logbooks.jlab.org/entry/3534117 3]
 +
#* [https://logbooks.jlab.org/entry/3534307 Alcohol bubbler temperature]
 +
#* [https://logbooks.jlab.org/entry/3534323 CDC gas pressure]
 +
#* [https://logbooks.jlab.org/entry/3534358 PS IOC]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3534309 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Accelerator down (their estimate: 6hrs until beam to A & C)
 +
#* Tuesday might also be an RF recovery day if it's not finished today
 +
#* Production
 +
 +
== Sunday, February 18 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator is planning to have RF recovery on Tuesday
 +
#* Harp scans remain consistent [https://logbooks.jlab.org/entry/3533454 5c11] [https://logbooks.jlab.org/entry/3533452 5c11b] [https://logbooks.jlab.org/entry/3533459 ours]
 +
#* Empty target run completed
 +
#* Raw mode run during target refill completed
 +
#* Sasha trigger studies completed
 +
#* Production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3533414 PS coincidence drift]
 +
#* [https://logbooks.jlab.org/entry/3533449 Active collimator spare electronics]
 +
# Reports (?):
 +
#* [https://logbooks.jlab.org/entry/3533870 Low level monitoring]
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Production
 +
#* Low intensity runs?
 +
#* More current scans?
 +
#* Other special runs?
  
 
== Saturday, February 17 ==
 
== Saturday, February 17 ==

Latest revision as of 07:59, 21 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Wednesday, February 21

  1. Notes from the previous 24 hours:
    • CDC threshold runs (standard & 2016 higher thresholds)
    • Continued production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Controlled access while down for tour
    • Zisis takes over as RC in the afternoon
    • Harp scan once beam returns
    • Production data

Tuesday, February 20

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production
    • VL or VVL intensity?
    • Current scans?
    • Tomorrow we will be down for a tour

Monday, February 19

  1. Notes from the previous 24 hours:
    • Continued production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Accelerator down (their estimate: 6hrs until beam to A & C)
    • Tuesday might also be an RF recovery day if it's not finished today
    • Production

Sunday, February 18

  1. Notes from the previous 24 hours:
    • Accelerator is planning to have RF recovery on Tuesday
    • Harp scans remain consistent 5c11 5c11b ours
    • Empty target run completed
    • Raw mode run during target refill completed
    • Sasha trigger studies completed
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production
    • Low intensity runs?
    • More current scans?
    • Other special runs?

Saturday, February 17

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Sasha's trigger tests
    • Harp scan
    • Empty target run
    • Raw mode run while filling target
    • Production
  5. Weekend meeting
    • Sunday at 10:30am

Friday, February 16

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Ask for improvement in the harp scan
    • Target studies by Chris Keith?
    • Continue production data?
    • Low intensity running?
    • AC scans?
    • Sasha trigger tests?
  5. Weekend meeting
    • What day and time?

Thursday, February 15

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Google Calendar:
    • Accelerator down 4hr for "restoring corners" starting around 9am.
    • Hall B Mott will be invasive, likely a couple hours without beam
    • Controlled access during accelerator downtime
      • Muon chamber work
      • FCAL?
      • Anyone else?
    • Harp scan once beam returns
    • AC scans
    • Sasha trigger study