Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Wednesday, February 21 == | ||
+ | |||
+ | # Notes from the previous 24 hours: | ||
+ | #* CDC threshold runs (standard & 2016 higher thresholds) | ||
+ | #* Continued production data | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3535225 AD00C XPOS drift] [https://logbooks.jlab.org/entry/3535254 due to beam energy fluctuation (HALLD:p)] [https://logbooks.jlab.org/entry/3535308 Oscillations in AD00C Y pos and CDC current too] [https://logbooks.jlab.org/entry/3535511 Frequent excursions overnight] | ||
+ | #* [https://logbooks.jlab.org/entry/3535285 Possible active target problem] | ||
+ | #* [https://logbooks.jlab.org/entry/3535578 Stuck PS coincidence rate] | ||
+ | # Reports (?): | ||
+ | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
+ | #* [https://logbooks.jlab.org/entry/3535587 Monitoring] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Controlled access while down for tour | ||
+ | #* Zisis takes over as RC in the afternoon | ||
+ | #* Harp scan once beam returns | ||
+ | #* Production data | ||
+ | |||
+ | == Tuesday, February 20 == | ||
+ | |||
+ | # Notes from the previous 24 hours: | ||
+ | #* Accelerator still has high RF trip rate | ||
+ | #* [https://logbooks.jlab.org/entry/3534435 FMWPC investigations] [https://logbooks.jlab.org/entry/3534461 2] | ||
+ | #* [https://logbooks.jlab.org/entry/3534448 FCAL base replacements] | ||
+ | #* [https://logbooks.jlab.org/entry/3534471 TAGM replacement preamp] | ||
+ | #* [https://logbooks.jlab.org/entry/3534542 ActiveMQ] | ||
+ | #* [https://logbooks.jlab.org/entry/3534592 Monitoring hists updated] | ||
+ | #* Continued production data | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3534655 DAQ issues] [https://logbooks.jlab.org/entry/3534724 2] | ||
+ | #* [https://logbooks.jlab.org/entry/3534930 Small timing shift] | ||
+ | # Reports (?): | ||
+ | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
+ | #* [https://logbooks.jlab.org/entry/3534994 Monitoring] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Production | ||
+ | #* VL or VVL intensity? | ||
+ | #* Current scans? | ||
+ | #* Tomorrow we will be down for a tour | ||
+ | |||
+ | == Monday, February 19 == | ||
+ | |||
+ | # Notes from the previous 24 hours: | ||
+ | #* Continued production data | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3534028 DAQ disconnect] | ||
+ | #* [https://logbooks.jlab.org/entry/3534100 TOF crate] [https://logbooks.jlab.org/entry/3534102 2] [https://logbooks.jlab.org/entry/3534117 3] | ||
+ | #* [https://logbooks.jlab.org/entry/3534307 Alcohol bubbler temperature] | ||
+ | #* [https://logbooks.jlab.org/entry/3534323 CDC gas pressure] | ||
+ | #* [https://logbooks.jlab.org/entry/3534358 PS IOC] | ||
+ | # Reports (?): | ||
+ | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
+ | #* [https://logbooks.jlab.org/entry/3534309 Monitoring] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Accelerator down (their estimate: 6hrs until beam to A & C) | ||
+ | #* Tuesday might also be an RF recovery day if it's not finished today | ||
+ | #* Production | ||
+ | |||
+ | == Sunday, February 18 == | ||
+ | |||
+ | # Notes from the previous 24 hours: | ||
+ | #* Accelerator is planning to have RF recovery on Tuesday | ||
+ | #* Harp scans remain consistent [https://logbooks.jlab.org/entry/3533454 5c11] [https://logbooks.jlab.org/entry/3533452 5c11b] [https://logbooks.jlab.org/entry/3533459 ours] | ||
+ | #* Empty target run completed | ||
+ | #* Raw mode run during target refill completed | ||
+ | #* Sasha trigger studies completed | ||
+ | #* Production data | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3533414 PS coincidence drift] | ||
+ | #* [https://logbooks.jlab.org/entry/3533449 Active collimator spare electronics] | ||
+ | # Reports (?): | ||
+ | #* [https://logbooks.jlab.org/entry/3533870 Low level monitoring] | ||
+ | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Production | ||
+ | #* Low intensity runs? | ||
+ | #* More current scans? | ||
+ | #* Other special runs? | ||
+ | |||
+ | == Saturday, February 17 == | ||
+ | |||
+ | # Notes from the previous 24 hours: | ||
+ | #* Accelerator delivered beam in the afternoon | ||
+ | #* [https://logbooks.jlab.org/entry/3533084 Collimator alignment scan completed] | ||
+ | #* [https://logbooks.jlab.org/entry/3533095 Active collimator calibration scans] | ||
+ | #* Production data | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3533113 DAQ issue on start-up prior to GUI appearing, only occurred once] | ||
+ | # Reports (?): | ||
+ | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Sasha's trigger tests | ||
+ | #* Harp scan | ||
+ | #* Empty target run | ||
+ | #* Raw mode run while filling target | ||
+ | #* Production | ||
+ | # Weekend meeting | ||
+ | #* Sunday at 10:30am | ||
== Friday, February 16 == | == Friday, February 16 == |
Latest revision as of 06:59, 21 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Wednesday, February 21
- Notes from the previous 24 hours:
- CDC threshold runs (standard & 2016 higher thresholds)
- Continued production data
- Issues:
- Reports (?):
- Intensity scan statistics
- Monitoring
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Controlled access while down for tour
- Zisis takes over as RC in the afternoon
- Harp scan once beam returns
- Production data
Tuesday, February 20
- Notes from the previous 24 hours:
- Accelerator still has high RF trip rate
- FMWPC investigations 2
- FCAL base replacements
- TAGM replacement preamp
- ActiveMQ
- Monitoring hists updated
- Continued production data
- Issues:
- Reports (?):
- Intensity scan statistics
- Monitoring
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Production
- VL or VVL intensity?
- Current scans?
- Tomorrow we will be down for a tour
Monday, February 19
- Notes from the previous 24 hours:
- Continued production data
- Issues:
- Reports (?):
- Intensity scan statistics
- Monitoring
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Accelerator down (their estimate: 6hrs until beam to A & C)
- Tuesday might also be an RF recovery day if it's not finished today
- Production
Sunday, February 18
- Notes from the previous 24 hours:
- Issues:
- Reports (?):
- Low level monitoring
- Intensity scan statistics
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Production
- Low intensity runs?
- More current scans?
- Other special runs?
Saturday, February 17
- Notes from the previous 24 hours:
- Accelerator delivered beam in the afternoon
- Collimator alignment scan completed
- Active collimator calibration scans
- Production data
- Issues:
- Reports (?):
- Intensity scan statistics
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Sasha's trigger tests
- Harp scan
- Empty target run
- Raw mode run while filling target
- Production
- Weekend meeting
- Sunday at 10:30am
Friday, February 16
- Notes from the previous 24 hours:
- Accelerator was down to restore the corners to values from a month ago
- Controlled Access
- Production data started around 2:30am
- Accelerator still having trouble delivering desired beam to all halls.
- Halls A and C are a factor of 3 lower in beam current
- Accelerator is discussing options which might involve beam going away (edit: Log entry discussing their plans)
- Issues:
- Reports (?):
- Intensity scan statistics
- Monitoring
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Ask for improvement in the harp scan
- Target studies by Chris Keith?
- Continue production data?
- Low intensity running?
- AC scans?
- Sasha trigger tests?
- Weekend meeting
- What day and time?
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change Rates
- Sergey and the DAQ group high intensity studies
- AC scan moved to later time with stable beam
- Intensity scan statistics
- Controlled Access
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Accelerator down 4hr for "restoring corners" starting around 9am.
- Hall B Mott will be invasive, likely a couple hours without beam
- Controlled access during accelerator downtime
- Muon chamber work
- FCAL?
- Anyone else?
- Harp scan once beam returns
- AC scans
- Sasha trigger study