Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, February 15)
(Wednesday, February 21)
 
(38 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs]
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs]
 
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Trigger Spreadsheet]
 
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Trigger Spreadsheet]
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]
+
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 +
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
  
 +
== Wednesday, February 21 ==
  
 +
# Notes from the previous 24 hours:
 +
#* CDC threshold runs (standard & 2016 higher thresholds)
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3535225 AD00C XPOS drift] [https://logbooks.jlab.org/entry/3535254 due to beam energy fluctuation (HALLD:p)] [https://logbooks.jlab.org/entry/3535308 Oscillations in AD00C Y pos and CDC current too] [https://logbooks.jlab.org/entry/3535511 Frequent excursions overnight]
 +
#* [https://logbooks.jlab.org/entry/3535285 Possible active target problem]
 +
#* [https://logbooks.jlab.org/entry/3535578 Stuck PS coincidence rate]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3535587 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Controlled access while down for tour
 +
#* Zisis takes over as RC in the afternoon
 +
#* Harp scan once beam returns
 +
#* Production data
 +
 +
== Tuesday, February 20 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator still has high RF trip rate
 +
#* [https://logbooks.jlab.org/entry/3534435 FMWPC investigations] [https://logbooks.jlab.org/entry/3534461 2]
 +
#* [https://logbooks.jlab.org/entry/3534448 FCAL base replacements]
 +
#* [https://logbooks.jlab.org/entry/3534471 TAGM replacement preamp]
 +
#* [https://logbooks.jlab.org/entry/3534542 ActiveMQ]
 +
#* [https://logbooks.jlab.org/entry/3534592 Monitoring hists updated]
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3534655 DAQ issues] [https://logbooks.jlab.org/entry/3534724 2]
 +
#* [https://logbooks.jlab.org/entry/3534930 Small timing shift]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3534994 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Production
 +
#* VL or VVL intensity?
 +
#* Current scans?
 +
#* Tomorrow we will be down for a tour
 +
 +
== Monday, February 19 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Continued production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3534028 DAQ disconnect]
 +
#* [https://logbooks.jlab.org/entry/3534100 TOF crate] [https://logbooks.jlab.org/entry/3534102 2] [https://logbooks.jlab.org/entry/3534117 3]
 +
#* [https://logbooks.jlab.org/entry/3534307 Alcohol bubbler temperature]
 +
#* [https://logbooks.jlab.org/entry/3534323 CDC gas pressure]
 +
#* [https://logbooks.jlab.org/entry/3534358 PS IOC]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3534309 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Accelerator down (their estimate: 6hrs until beam to A & C)
 +
#* Tuesday might also be an RF recovery day if it's not finished today
 +
#* Production
 +
 +
== Sunday, February 18 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator is planning to have RF recovery on Tuesday
 +
#* Harp scans remain consistent [https://logbooks.jlab.org/entry/3533454 5c11] [https://logbooks.jlab.org/entry/3533452 5c11b] [https://logbooks.jlab.org/entry/3533459 ours]
 +
#* Empty target run completed
 +
#* Raw mode run during target refill completed
 +
#* Sasha trigger studies completed
 +
#* Production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3533414 PS coincidence drift]
 +
#* [https://logbooks.jlab.org/entry/3533449 Active collimator spare electronics]
 +
# Reports (?):
 +
#* [https://logbooks.jlab.org/entry/3533870 Low level monitoring]
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Production
 +
#* Low intensity runs?
 +
#* More current scans?
 +
#* Other special runs?
 +
 +
== Saturday, February 17 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator delivered beam in the afternoon
 +
#* [https://logbooks.jlab.org/entry/3533084 Collimator alignment scan completed]
 +
#* [https://logbooks.jlab.org/entry/3533095 Active collimator calibration scans]
 +
#* Production data
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3533113 DAQ issue on start-up prior to GUI appearing, only occurred once]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Sasha's trigger tests
 +
#* Harp scan
 +
#* Empty target run
 +
#* Raw mode run while filling target
 +
#* Production
 +
# Weekend meeting
 +
#* Sunday at 10:30am
 +
 +
== Friday, February 16 ==
 +
 +
# Notes from the previous 24 hours:
 +
#* Accelerator was down to restore the corners to values from a month ago
 +
#* Controlled Access
 +
#** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases]
 +
#** [https://logbooks.jlab.org/entry/3532513 The muon chamber steel plate was moved behind the detector]
 +
#** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings]
 +
#* Production data started around 2:30am
 +
#* Accelerator still having trouble delivering desired beam to all halls.
 +
#** Halls A and C are a factor of 3 lower in beam current
 +
#** Accelerator is discussing options which might involve beam going away (edit: [https://logbooks.jlab.org/entry/3532898 Log entry discussing their plans])
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3532858 Harp scan results still not great]
 +
#* [https://logbooks.jlab.org/entry/3532831 PS rate dropped overnight]
 +
# Reports (?):
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3532786 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Ask for improvement in the harp scan
 +
#* Target studies by Chris Keith?
 +
#* Continue production data?
 +
#* Low intensity running?
 +
#* AC scans?
 +
#* Sasha trigger tests?
 +
# Weekend meeting
 +
#* What day and time?
  
 
== Thursday, February 15 ==
 
== Thursday, February 15 ==
Line 15: Line 141:
 
#** (in the evening) [https://logbooks.jlab.org/entry/3531901 Alex B. went in to swap voltage adapters for the active collimator]
 
#** (in the evening) [https://logbooks.jlab.org/entry/3531901 Alex B. went in to swap voltage adapters for the active collimator]
 
#* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study]
 
#* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study]
#* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change]
+
#* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change] [https://logbooks.jlab.org/entry/3532363 Rates]
#* Sergey and the DAQ group high intensity studies were started
+
#* Sergey and the DAQ group high intensity studies
 +
#* AC scan moved to later time with stable beam
 +
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 
# Issues:
 
# Issues:
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
+
#* [https://logbooks.jlab.org/entry/3532231 DAQ issues]
 
# Reports (?):
 
# Reports (?):
# Standing issues:
+
#* [https://logbooks.jlab.org/entry/3532310 Monitoring]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
 +
#* Accelerator down 4hr for "restoring corners" starting around 9am.
 +
#* Hall B Mott will be invasive, likely a couple hours without beam
 +
#* Controlled access during accelerator downtime
 +
#** Muon chamber work
 +
#** FCAL?
 +
#** Anyone else?
 +
#* Harp scan once beam returns
 +
#* AC scans
 +
#* Sasha trigger study

Latest revision as of 07:59, 21 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Wednesday, February 21

  1. Notes from the previous 24 hours:
    • CDC threshold runs (standard & 2016 higher thresholds)
    • Continued production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Controlled access while down for tour
    • Zisis takes over as RC in the afternoon
    • Harp scan once beam returns
    • Production data

Tuesday, February 20

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production
    • VL or VVL intensity?
    • Current scans?
    • Tomorrow we will be down for a tour

Monday, February 19

  1. Notes from the previous 24 hours:
    • Continued production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Accelerator down (their estimate: 6hrs until beam to A & C)
    • Tuesday might also be an RF recovery day if it's not finished today
    • Production

Sunday, February 18

  1. Notes from the previous 24 hours:
    • Accelerator is planning to have RF recovery on Tuesday
    • Harp scans remain consistent 5c11 5c11b ours
    • Empty target run completed
    • Raw mode run during target refill completed
    • Sasha trigger studies completed
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production
    • Low intensity runs?
    • More current scans?
    • Other special runs?

Saturday, February 17

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Sasha's trigger tests
    • Harp scan
    • Empty target run
    • Raw mode run while filling target
    • Production
  5. Weekend meeting
    • Sunday at 10:30am

Friday, February 16

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Ask for improvement in the harp scan
    • Target studies by Chris Keith?
    • Continue production data?
    • Low intensity running?
    • AC scans?
    • Sasha trigger tests?
  5. Weekend meeting
    • What day and time?

Thursday, February 15

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Google Calendar:
    • Accelerator down 4hr for "restoring corners" starting around 9am.
    • Hall B Mott will be invasive, likely a couple hours without beam
    • Controlled access during accelerator downtime
      • Muon chamber work
      • FCAL?
      • Anyone else?
    • Harp scan once beam returns
    • AC scans
    • Sasha trigger study