Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, February 16)
(Friday, February 16)
Line 17: Line 17:
 
#* Accelerator still having trouble delivering desired beam to all halls.
 
#* Accelerator still having trouble delivering desired beam to all halls.
 
#** Halls A and C are a factor of 3 lower in beam current
 
#** Halls A and C are a factor of 3 lower in beam current
#** Accelerator is discussing options which might involve beam going away
+
#** Accelerator is discussing options which might involve beam going away (edit: [https://logbooks.jlab.org/entry/3532898 Log entry discussing their plans])
 
# Issues:
 
# Issues:
 
#* [https://logbooks.jlab.org/entry/3532858 Harp scan results still not great]
 
#* [https://logbooks.jlab.org/entry/3532858 Harp scan results still not great]

Revision as of 15:37, 17 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, February 16

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Ask for improvement in the harp scan
    • Target studies by Chris Keith?
    • Continue production data?
    • Low intensity running?
    • AC scans?
    • Sasha trigger tests?
  5. Weekend meeting
    • What day and time?

Thursday, February 15

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Google Calendar:
    • Accelerator down 4hr for "restoring corners" starting around 9am.
    • Hall B Mott will be invasive, likely a couple hours without beam
    • Controlled access during accelerator downtime
      • Muon chamber work
      • FCAL?
      • Anyone else?
    • Harp scan once beam returns
    • AC scans
    • Sasha trigger study