== Monday, February 5 ==
 
== Monday, February 5 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#* South Linac down for ~?? hrs due to CHL issue
+
#* South Linac down for ~5 hrs due to CHL issue
 +
#* Beam unstable and position Y position drifting overnight
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]
 
#* [https://logbooks.jlab.org/entry/3527325 Low level monitoring]
 
#* [https://logbooks.jlab.org/entry/3527325 Low level monitoring]
Line 15: Line 16:
 
#* Walkthrough for Ahmed
 
#* Walkthrough for Ahmed
 
# Issues:
 
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3526966 Radiator ID in RCDB?]
 +
#* [https://logbooks.jlab.org/entry/3527061 Edge drifts with Y position]
 
#* Process for changes to production configuration (discussion):
 
#* Process for changes to production configuration (discussion):
 
# Today's run plan [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Google Calendar]:
 
# Today's run plan [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Google Calendar]:
Line 20: Line 23:
 
#* Production running
 
#* Production running
 
# Reports:
 
# Reports:
#* [https://logbooks.jlab.org/entry/3526423 PS enhancements after retune]
+
#* [https://logbooks.jlab.org/entry/3526423 PS enhancements after retune] and [https://logbooks.jlab.org/entry/3526981 CBSA polarization vs run number]
 
#* [https://logbooks.jlab.org/entry/3525828 Empty target analysis]
 
#* [https://logbooks.jlab.org/entry/3525828 Empty target analysis]
 
#* [https://logbooks.jlab.org/entry/3525907 rho asymmetry update]
 
#* [https://logbooks.jlab.org/entry/3525907 rho asymmetry update]

Revision as of 08:14, 5 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, February 5

  1. Notes from the previous 24 hours:
  2. Today's access (starting at 7 am):
    • Re-installation of the muon chamber (at least 2 hours with 3+ people)
    • FCAL base maintenance (1-2 hours for base replacement + 1-2 hours for each channel tests)
    • TPOL sector 3 investigation
    • TAGM light leak test for columns 82-84 (2+ hours)
    • CDC bubbler evaluation and re-fill
    • Profiler radiator changed (Pb -> Al?)
    • Walkthrough for Ahmed
  3. Issues:
  4. Today's run plan Google Calendar:
    • Hall Access (unknown duration)
    • Production running
  5. Reports:
  6. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • TPOL analysis status?

Sunday, February 4

  1. Notes from the previous 48 hours:
    • Friday day shift: L1 trigger studies (~2 hrs) for min-bias trigger and high rate DAQ test (~1.5 hrs)
    • Saturday AM: South Linac down for ~4 hrs
    • After South Linac recovers, harp scans show beam convergence at collimator looks good.
    • Spreadsheet: number of triggers: ~4 B triggers in last 2 days.
    • Low level monitoring
  2. Tomorrow's potential access (7 am Monday):
    • Re-installation of the muon chamber
    • FCAL base maintenance
    • TPOL sector 3 investigation
    • CDC bubbler evaluation and re-fill
    • Walkthrough for Ahmed
  3. Issues:
  4. Today's run plan Google Calendar:
    • Production running
  5. Reports:
  6. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • TPOL analysis status?

Friday, February 2

  1. Notes from the previous 24 hours:
    • Harp scans around 2 pm found the beam was significantly over-focused in y. Around the same time MCC decided to retune the beam.
    • After beam tuning in the afternoon, harp scans around 8 pm showed convergence at the collimator is better
    • 12.6 hours of CW beam. ABU: 10.9 hrs (3.2+1.7+6.0), BANU: 1.7 hrs (0.3+0.7+0.7), BNA: 11.3 hrs (4.5+5.6+1.2)
    • Spreadsheet: number of triggers.
    • Low level monitoring
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production running
    • 10 am: Min-bias trigger setup (Sasha)
    • 11:30 am: High intensity test (Sergey)
  4. Reports:
  5. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • Polarization status?
  6. Beam Time Accounting (BTA) discussion:
    • 3 possible conditions:
      • ABU: Available Beam Used
      • BANU: Beam Available [to the Hall] but Not Used [by the Hall]
      • BNA: Beam Not Available [to the Hall]
    • Automated procedure in MCC for populating BTA have not been very reliable
    • Proposal from Mark D:
      • Shift leader should record the integrated time that we request no beam (for example changing the radiator or other experiment downtime). When submitting the BTA form, the shift leader should check that the BANU and BNA numbers are correct (ie. BANU does not exceed the integrated time we request no beam). If they are not correct, the shift leader should move all the time that is listed under BANU into the BNA column unless they specifically requested no beam from MCC.

Thursday, February 1

  1. Notes from the previous 24 hours:
    • After empty target run, beam intermittent. Trouble setting up V-wire TAC run, due to lock on Active Collimator not providing consistent TAC rate.
    • 8 PM start production TAC run with lock on Beam Profiler. TAC rate initially at ~200 kHz, but dropped to 100 kHz overnight.
    • 5:30 AM stopped the TAC run and switch to production: target filled, beamline back in production configuration and production run started.
    • 16.1 hours of CW beam. ABU: 14.4 hrs (4.9+3.5+6.0), BANU: 1.7 hrs (0.1+0.8+0.8)
    • Spreadsheet: number of triggers.
    • Low level monitoring
  2. Issues:
  3. Run plan for this week:
    • Low intensity runs planned for tonight: what is the status of min-bias triggers?
  4. Today's run plan:
    • At 9 AM (or after run production run 41172):
      • Harp scans by MCC and Hall D (Hovanes on shift)
    • Production running the rest of the day
  5. Reports:
  6. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • Polarization status? Came up at MCC meeting, Eugene suggested to report next week.