Difference between revisions of "Run Planning Meeting Notes, Feb 1-Feb 7, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, February 2)
(Friday, February 2)
Line 3: Line 3:
 
== Friday, February 2 ==
 
== Friday, February 2 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#* After optics tuning in the afternoon, harp scans show convergence at the collimator is [https://logbooks.jlab.org/entry/3525483 better]  
+
#* Harp scans around 2 pm found the beam was significantly over-focused in y.  Around the same time MCC decided to retune the beam.
 +
#* After beam tuning in the afternoon, harp scans around 8 pm showed convergence at the collimator is [https://logbooks.jlab.org/entry/3525483 better]  
 
#* ? hours of CW beam. ABU: ? hrs (?), BANU: ? hrs (?)
 
#* ? hours of CW beam. ABU: ? hrs (?), BANU: ? hrs (?)
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers].
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers].
Line 11: Line 12:
 
#* 5C11B position wandering
 
#* 5C11B position wandering
 
#* [https://logbooks.jlab.org/entry/3525604 Coherent edge fitting]: did something change in TAGM?
 
#* [https://logbooks.jlab.org/entry/3525604 Coherent edge fitting]: did something change in TAGM?
 +
#* [https://logbooks.jlab.org/entry/3525172 ROOTSpy Modification]
 +
#* [https://logbooks.jlab.org/entry/3525262 New DAQ default configuration]
 
# Today's run plan [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Google Calendar]:
 
# Today's run plan [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Google Calendar]:
 
#* Production running
 
#* Production running
Line 16: Line 19:
 
#* 11:30 am: High intensity test (Sergey)
 
#* 11:30 am: High intensity test (Sergey)
 
# Reports:
 
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3525387 ρ asymmetry (offline monitoring ver06)]
 
# Standing issues:
 
# Standing issues:
 
#* [https://logbooks.jlab.org/entry/3524060 Rate evolution]: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
 
#* [https://logbooks.jlab.org/entry/3524060 Rate evolution]: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.

Revision as of 08:31, 2 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, February 2

  1. Notes from the previous 24 hours:
    • Harp scans around 2 pm found the beam was significantly over-focused in y. Around the same time MCC decided to retune the beam.
    • After beam tuning in the afternoon, harp scans around 8 pm showed convergence at the collimator is better
    •  ? hours of CW beam. ABU: ? hrs (?), BANU: ? hrs (?)
    • Spreadsheet: number of triggers.
    • Low level monitoring
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production running
    • 10 am: Min-bias trigger setup (Sasha)
    • 11:30 am: High intensity test (Sergey)
  4. Reports:
  5. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • Polarization status?

Thursday, February 1

  1. Notes from the previous 24 hours:
    • After empty target run, beam intermittent. Trouble setting up V-wire TAC run, due to lock on Active Collimator not providing consistent TAC rate.
    • 8 PM start production TAC run with lock on Beam Profiler. TAC rate initially at ~200 kHz, but dropped to 100 kHz overnight.
    • 5:30 AM stopped the TAC run and switch to production: target filled, beamline back in production configuration and production run started.
    • 16.1 hours of CW beam. ABU: 14.4 hrs (4.9+3.5+6.0), BANU: 1.7 hrs (0.1+0.8+0.8)
    • Spreadsheet: number of triggers.
    • Low level monitoring
  2. Issues:
  3. Run plan for this week:
    • Low intensity runs planned for tonight: what is the status of min-bias triggers?
  4. Today's run plan:
    • At 9 AM (or after run production run 41172):
      • Harp scans by MCC and Hall D (Hovanes on shift)
    • Production running the rest of the day
  5. Reports:
  6. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
    • Polarization status? Came up at MCC meeting, Eugene suggested to report next week.