Run Planning Meeting Notes, December 7 - December 14, 2022

From GlueXWiki
Revision as of 09:30, 8 December 2022 by Aasatury (Talk | contribs) (Created page with "= Thursday Dec. 8th = === Last 24h === *Wednesday was RF recovery day, Hall was in Controlled Access till ~6:30pm, many things where done during access in Hall. **Hall (Contro...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Thursday Dec. 8th

Last 24h

  • Wednesday was RF recovery day, Hall was in Controlled Access till ~6:30pm, many things where done during access in Hall.
    • Hall (Controlled Access):
      • Tim worked on Tagger magnet NMR [1]
      • Sasha replaced the BCAL fADC [2]
      • DIRC checkout (Justin+1).
      • Sasha, Vlad, Lubomir, Sergei and Arshak: work in the PS test area.
      • Sasha, Arshak and Malte did some preliminary noise level tests at FCAL
      • Mark Stevens: walkthrough for OPS.
      • Tim and Eugene checked the man-lift
      • Tim and Sasha checked by how much FCal can be pushed back (for some tentative PrimEx systematic measurements).
  • After beam comes back:

Shift Summaries

Issues

Short term run plan

  • TAC run?
  • Take date on LHe FULL target at 200nA beam