Run Planning Meeting Notes, April 19-April 25, 2016

From GlueXWiki
Revision as of 08:30, 19 April 2016 by Dalton (Talk | contribs)

Jump to: navigation, search

Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
      • Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Report on Trigger studies
    • Report on TRD studies
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
      • RadCon has been contacted. Collimator cave access from 10 am or earlier.
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Empty Target run with 5 mm hole (Thursday ?)
    • TAGM alignment (Thursday ?)
    • Latest Occupancy Plots
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?