Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"

From GlueXWiki
Jump to: navigation, search
(Created page with "* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule] * [http://cale...")
 
Line 7: Line 7:
 
# Accelerator Status
 
# Accelerator Status
 
#*  Running overnight
 
#*  Running overnight
#** ABUs
+
#** ABUs (309 + 328 + ??)
#** Triggers
+
#** Triggers ()
 
#*  Scheduled accelerator down on Wednesday 20 April.
 
#*  Scheduled accelerator down on Wednesday 20 April.
 
#** RF recovery, beam studies, Hall A pass change
 
#** RF recovery, beam studies, Hall A pass change

Revision as of 07:08, 19 April 2016


Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs (309 + 328 + ??)
      • Triggers ()
    • Scheduled accelerator down on Wednesday 20 April.
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
      • RadCon has been contacted. Collimator cave access from 10 am or earlier.
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Empty Target run with 5 mm hole
    • TAGM alignment
    • Latest Occupancy Plots
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?