Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"

From GlueXWiki
Jump to: navigation, search
(Tuesday, April 24 at 08:45)
(Tuesday, April 24 at 08:45)
Line 11: Line 11:
 
# Reports:
 
# Reports:
 
#* [https://logbooks.jlab.org/entry/3565782 Active collimator orbit lock period adjustment]
 
#* [https://logbooks.jlab.org/entry/3565782 Active collimator orbit lock period adjustment]
 +
#* [https://logbooks.jlab.org/entry/3565736 Focusing in x is really good, not so much in y]
 
#* High rate L1 tests  
 
#* High rate L1 tests  
 
#* High rates test of new CODA version
 
#* High rates test of new CODA version
 +
#* Active Collimator Raster Scan [https://logbooks.jlab.org/entry/3565868], [https://logbooks.jlab.org/entry/3565869], [https://logbooks.jlab.org/entry/3565872], [https://logbooks.jlab.org/entry/3565878], [https://logbooks.jlab.org/entry/3565883]
 
# Issues:
 
# Issues:
 
#* [https://logbooks.jlab.org/entry/3565957 Apparent energy jump]
 
#* [https://logbooks.jlab.org/entry/3565957 Apparent energy jump]

Revision as of 08:19, 24 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Tuesday, April 24 at 08:45

  1. Notes from previous 24 hours:
    • Production running
  2. Reports:
  3. Issues:

DAQ crash

  1. Run Plan
    • Tuesday
      • RF recovery Access
        • Muon chamber removal
        • Walk through
        • Change basses
        • Add lead to profiler
      • Empty target run
      • Raw (full waveform) mode running while target filling
      • Production
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  2. AOB

Monday, April 23 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
      • Raster scan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
      • Add lead to profiler
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB