(Monday, April 22 at 08:45)
(Monday, April 23 at 08:45)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Tuesday, April 24 at 08:45 ==
 +
# Notes from previous 24 hours:
 +
#* Production running
 +
# Reports:
 +
#** High rate L1 tests
 +
#** High rates test of new CODA version
 +
# Issues:
 +
#*
 +
# Run Plan
 +
#* Tuesday
 +
#** RF recovery
 +
#** Muon chamber removal
 +
#** Walk through
 +
#** Change basses
 +
#** Add lead to profiler
 +
#* Wednesday
 +
#** Tour of Hall D.  Restricted access.  10:10 am 40 people.
 +
#* Thursday
 +
#** TAC run
 +
#* Longer term run plan
 +
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 +
#** Super high current (~500 nA) Raw mode and
 +
# AOB
 +
  
 
== Monday, April 23 at 08:45 ==
 
== Monday, April 23 at 08:45 ==

Revision as of 07:41, 24 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Tuesday, April 24 at 08:45

  1. Notes from previous 24 hours:
    • Production running
  2. Reports:
      • High rate L1 tests
      • High rates test of new CODA version
  3. Issues:
  4. Run Plan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
      • Add lead to profiler
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB


Monday, April 23 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
      • Raster scan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
      • Add lead to profiler
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB