(Monday, April 22 at 08:45)
(Monday, April 22 at 08:45)
Line 33: Line 33:
 
#** Add lead to profiler
 
#** Add lead to profiler
 
#* Wednesday
 
#* Wednesday
#** Tour of Hall D (Restricted access?)
+
#** Tour of Hall DRestricted access.  10:10 am 40 people.
 
#* Thursday
 
#* Thursday
 
#** TAC run
 
#** TAC run

Revision as of 09:52, 23 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 22 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
      • Raster scan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
      • Add lead to profiler
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB