Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"

From GlueXWiki
Jump to: navigation, search
(Monday, April 22 at 08:45)
(Monday, April 22 at 08:45)
Line 24: Line 24:
 
#** High rates test of new CODA version
 
#** High rates test of new CODA version
 
#** Production running
 
#** Production running
 +
#** Raster scan
 
#* Tuesday
 
#* Tuesday
 
#** RF recovery
 
#** RF recovery
 
#** Muon chamber removal
 
#** Muon chamber removal
 +
#** Walk through
 +
#** Change basses
 +
#* Wednesday
 +
#** Tour of Hall D (Restricted access?)
 
#* Longer term run plan
 
#* Longer term run plan
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 +
#** Super high current (~500 nA) Raw mode and
 
# AOB
 
# AOB
  

Revision as of 09:18, 23 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 22 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
      • Raster scan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
    • Wednesday
      • Tour of Hall D (Restricted access?)
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB