Line 5: Line 5:
 
** The photon beam commissioning went relatively fast as the accelerator was still on during the configuration change. The beam recovery took less than 3 hours. Also, the commissioning was greatly simplified: no ion chamber threshold determination was needed, and no radiation study was done. During the commissioning, we find out that the Active Collimator was not working properly. The inner -Y quadrant was saturating. This was solved by Nick with the support of Richard. Because of that we lost approximately 4 hours of the beam as access to Collimator Cave was needed.
 
** The photon beam commissioning went relatively fast as the accelerator was still on during the configuration change. The beam recovery took less than 3 hours. Also, the commissioning was greatly simplified: no ion chamber threshold determination was needed, and no radiation study was done. During the commissioning, we find out that the Active Collimator was not working properly. The inner -Y quadrant was saturating. This was solved by Nick with the support of Richard. Because of that we lost approximately 4 hours of the beam as access to Collimator Cave was needed.
 
*** Instead of AC, we used the Beam Profiler for the beam to lock on for part of the week
 
*** Instead of AC, we used the Beam Profiler for the beam to lock on for part of the week
** CCAL snake-scan used HallC bleedthrough coming out of the slice we are sharing with HallC which gave a stable electron beam of >1.5nA
+
** CCAL snake-scan used HallC bleedthrough coming out of the slite we are sharing with HallC which gave a stable electron beam of >1.5nA
 
** Production data was taken, after Sasha re-establish the PrimEx trigger, (~1B trigger) with "Be empty target" and with solenoid B-field on and off, half of this data was taken with a buggy AC and the rest with a debugged AC. In both cases, the beam was locked on the AC.
 
** Production data was taken, after Sasha re-establish the PrimEx trigger, (~1B trigger) with "Be empty target" and with solenoid B-field on and off, half of this data was taken with a buggy AC and the rest with a debugged AC. In both cases, the beam was locked on the AC.
 
** Richard performed a TAGM Vbias scan and new threshold determination.
 
** Richard performed a TAGM Vbias scan and new threshold determination.

Revision as of 13:01, 31 August 2022

Summary for the week of August 25 - August 31, 2022

  • The first part of the week (Wednesday, Thursday, and Friday morning) was used to change the setup configuration from CPP to PrimEx-eta.
  • The second part of the week was used for the beam commissioning, CCAL calibration, TAGM calibration, and starting physics production
    • The photon beam commissioning went relatively fast as the accelerator was still on during the configuration change. The beam recovery took less than 3 hours. Also, the commissioning was greatly simplified: no ion chamber threshold determination was needed, and no radiation study was done. During the commissioning, we find out that the Active Collimator was not working properly. The inner -Y quadrant was saturating. This was solved by Nick with the support of Richard. Because of that we lost approximately 4 hours of the beam as access to Collimator Cave was needed.
      • Instead of AC, we used the Beam Profiler for the beam to lock on for part of the week
    • CCAL snake-scan used HallC bleedthrough coming out of the slite we are sharing with HallC which gave a stable electron beam of >1.5nA
    • Production data was taken, after Sasha re-establish the PrimEx trigger, (~1B trigger) with "Be empty target" and with solenoid B-field on and off, half of this data was taken with a buggy AC and the rest with a debugged AC. In both cases, the beam was locked on the AC.
    • Richard performed a TAGM Vbias scan and new threshold determination.
    • Hovanes did a PS HARP scan.
  • On the last day of the week:
    • The Be target was inserted.
    • Nick further improve the AC performance at high gain needed for low beam current operation and in particular TAC run
    • Nick also debugged the 3 SC missing channels by nudging the cable a little bit
    • It was decided not to touch the CDC as we can live with two HV channels broken