Run Coordinator report: Fall 2021 w3

From GlueXWiki
Revision as of 14:29, 13 October 2021 by Ijaegle (Talk | contribs) (Created page with "RC summary September 23 - September 29, 2021 There was no beam for a little bit more than half of the week. We lost 4 hours when the beam was available to debug the tagger mi...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RC summary September 23 - September 29, 2021

There was no beam for a little bit more than half of the week. We lost 4 hours when the beam was available to debug the tagger microscope (there was a wrong cabling issue). During the downtime, a dozen FCAL channels were required to be debugged, by either replacing a PMT or more frequently a base. During this week, the PrimEx physics production started with Be target (50 nA) and CDC & FDC turn on aka FDC straight track run for 2.5 shifts. Then, we continue for 2 shifts to take data with the chambers off and the beam current increased to 100 nA. Finally, we started the 10 shifts chunk of 200 nA Be data set.