Difference between revisions of "Run Coordination Meetings: Fall 2014"

From GlueXWiki
Jump to: navigation, search
(Meeting General Agenda)
Line 29: Line 29:
 
#*<span style="color:red">Target/Start Counter Installed/Surveyed (Tuesday 16th need ground cable)</span>
 
#*<span style="color:red">Target/Start Counter Installed/Surveyed (Tuesday 16th need ground cable)</span>
 
#*<span style="color:blue"> Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)</span>
 
#*<span style="color:blue"> Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)</span>
 +
#*<span style="color:red">Tagger shielding </span>
 +
#*<span style="color:red">Pair Spectrometer remote control. </span>; <span style="color:blue">Field readout </span>
 +
#*<span style="color:red">Survey:
 +
#** FDC under field
 +
#**Profiler
 +
#**Start counter
 +
#** Collimator
 +
#** FCal
 +
#**Pair Spectrometer detector
 +
#**Pair Spectrometer Harp</span>
 +
#*<span style="color:red"> </span>
 +
#*<span style="color:red"> </span>
 +
#*<span style="color:red"> </span>
 +
#*<span style="color:red"> </span>
 +
#*<span style="color:green"> </span>
 +
#*<span style="color:blue"> </span>
 +
#*<span style="color:blue"> </span>
 +
#*<span style="color:blue"> </span>
 
# Specific safety notice (from Tom/Tim/Mark)
 
# Specific safety notice (from Tom/Tim/Mark)

Revision as of 15:11, 12 September 2014

General information

Daily Meetings, 8:45am, Hall D conference room. Held by the Run Coordinator.

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.

Meeting General Agenda

  1. Report relevant updates from 7:50 and 8:00 daily MCC meetings
  2. Report on yesterday Hall D related events
  3. Hot Check OUT Status
  4. Installation punch list (items in red: must by Sept 22nd ; Blue: Done by 2nd Fall run; Green: Nice to have it
    • Pair converter operational
    • Pair spectrometer detector surveyed
    • Profile monitors
    • Active collimator: Checked-Installed-Readout
    • Target/Start Counter Installed/Surveyed (Tuesday 16th need ground cable)
    • Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)
    • Tagger shielding
    • Pair Spectrometer remote control. ; Field readout
    • Survey:
      • FDC under field
      • Profiler
      • Start counter
      • Collimator
      • FCal
      • Pair Spectrometer detector
      • Pair Spectrometer Harp
  5. Specific safety notice (from Tom/Tim/Mark)