Difference between revisions of "Photon Beam"
From GlueXWiki
Line 23: | Line 23: | ||
</table> | </table> | ||
− | ==Working Group Information== | + | ==Photon Beam Working Group Information== |
* [[Tagged Beam Group Biweekly Meetings|group meetings]] | * [[Tagged Beam Group Biweekly Meetings|group meetings]] | ||
* [mailto:halld-tagger@jlab.org send email to group list] | * [mailto:halld-tagger@jlab.org send email to group list] |
Revision as of 11:14, 23 June 2014
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
Photon Beam Working Group Information
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
Reference documents
- engineering drawings
- rack locations in the tagger hall
- microscope readout cable lengths and routes
- alignment and calibration
- beam commissioning plan
Accelerator Information
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- Links to Accelerator Beamline Drawings