Difference between revisions of "Photon Beam"

From GlueXWiki
Jump to: navigation, search
Line 30: Line 30:
 
* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-tagger/ browse mailing list archives]
 
* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-tagger/ browse mailing list archives]
 
* [[Private:BLTWG membership|working group members (private)]]
 
* [[Private:BLTWG membership|working group members (private)]]
* [[rack locations in the tagger hall]]
+
 
 +
==Reference documents==
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 +
* [[rack locations in the tagger hall]]
 
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]]
 
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]]
 
* [[Alignment and Calibration|alignment and calibration]]
 
* [[Alignment and Calibration|alignment and calibration]]
* [[Beam Commissioning Plan]]
+
* [[Beam Commissioning Plan|beam commissioning plan]]
  
 
==Accelerator Information==
 
==Accelerator Information==

Revision as of 11:12, 23 June 2014

Design requirements
Spectrometers
Instrumentation
Radiator System
Photon beam pipe
Collimation system
Sweep Magnet 1
Shielding and radiation doses
Sweep magnet 2
Beam simulations

This is the central reporting page for the
GlueX Tagged Photon Beam Working Group

Working Group Information

Reference documents

Accelerator Information