Difference between revisions of "Photon Beam"

From GlueXWiki
Jump to: navigation, search
Line 35: Line 35:
 
* [[discussion of e+/e- tertiary beams in Hall D]]
 
* [[discussion of e+/e- tertiary beams in Hall D]]
 
<br>
 
<br>
* [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)]
+
* Accelerator:
 +
** [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)]
 +
** [http://www.jlab.org/MEgroup/12GeVacc3.html Accelerator Songsheets]
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 
* [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]]
 
* [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]]

Revision as of 09:17, 4 October 2013

Design requirements
Spectrometers
Instrumentation
Radiator System
Photon beam pipe
Collimation system
Sweep Magnet 1
Shielding and radiation doses
Sweep magnet 2
Beam simulations

This is the central reporting page for the
GlueX Tagged Photon Beam Working Group