Pair Spectrometer Hodoscope

From GlueXWiki
Jump to: navigation, search

Hodoscope Prototype Development

Final Design

Slow Control

PS electronics test

PS Construction

PS Rate Monitor

Beam commissioning: Fall 2014

Beam commissioning: Spring 2015

Beam commissioning: Fall 2015

Beam commissioning: Spring 2016

Pair Spectrometer Counters

Construction of Low-Granularity counters

Photon Flux Determination

PS acceptance and luminosity determination


18D36 magnet

Plan for mapping PS magnet

Mapping PS results

Field stability study

TOSCA simulation

Retrieved from "https://halldweb1.jlab.org/wiki/index.php?title=Pair_Spectrometer_Hodoscope&oldid=87260"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Main page
  • Recent changes
  • Random page
  • Help

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Permanent link
  • Page information
  • Cite this page
Powered by MediaWiki
  • This page was last modified on 25 May 2018, at 09:51.
  • This page has been accessed 7,860 times.
  • Privacy policy
  • About GlueXWiki
  • Disclaimers