Difference between revisions of "Pair Spectrometer Hodoscope"

From GlueXWiki
Jump to: navigation, search
 
(8 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
[[ PS Rate Monitor ]]
 
[[ PS Rate Monitor ]]
  
[[ Photon beam commissioning in Fall 2014 ]]
+
[[ Beam commissioning: Fall 2014 ]]
 +
 
 +
[[ Beam commissioning: Spring 2015 ]]
 +
 
 +
[[ Beam commissioning: Fall 2015 ]]
 +
 
 +
[[ Beam commissioning: Spring 2016 ]]
  
 
=== Pair Spectrometer Counters ===
 
=== Pair Spectrometer Counters ===
 
[[ Construction of Low-Granularity counters]]
 
[[ Construction of Low-Granularity counters]]
 +
 +
=== Photon Flux Determination ===
 +
[[ PS acceptance and luminosity determination ]]
 +
  
 
=== 18D36 magnet ===
 
=== 18D36 magnet ===
Line 23: Line 33:
  
 
[[Field stability study]]
 
[[Field stability study]]
 +
 +
[[TOSCA simulation]]

Latest revision as of 10:51, 25 May 2018

Hodoscope Prototype Development

Final Design

Slow Control

PS electronics test

PS Construction

PS Rate Monitor

Beam commissioning: Fall 2014

Beam commissioning: Spring 2015

Beam commissioning: Fall 2015

Beam commissioning: Spring 2016

Pair Spectrometer Counters

Construction of Low-Granularity counters

Photon Flux Determination

PS acceptance and luminosity determination


18D36 magnet

Plan for mapping PS magnet

Mapping PS results

Field stability study

TOSCA simulation