(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday October 8, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...")
 
(Agenda)
 
(12 intermediate revisions by 4 users not shown)
Line 17: Line 17:
  
 
# Announcements
 
# Announcements
#* JLab management still deciding how to make up lost time this Fall: [https://halldweb.jlab.org/DocDB/0037/003775/001/Fall-2018-Running.pdf preliminary plan from Hall D]
+
#* JLab management still deciding how to make up lost time this Fall
 +
#* [https://halldweb.jlab.org/DocDB/0037/003775/001/Fall-2018-Running.pdf Preliminary plan from Hall D at CM]: CompCal is priority for Fall, but continue with DIRC installation in parallel
 
# Optical box
 
# Optical box
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
#** Optical box
 
 
#** Mirror boxes delivered to JLab! (Ernie)
 
#** Mirror boxes delivered to JLab! (Ernie)
 +
#** [https://halldweb.jlab.org/wiki/index.php/File:BR_DIRC_FLANGE_Summary_lower_box.xls Warping of window flange] and plan to address at Lesker (Ernie/Tim)
 
#** Dark box enclosure (Jason)
 
#** Dark box enclosure (Jason)
 
#** Quartz window (with modified flange) (Ernie)
 
#** Quartz window (with modified flange) (Ernie)
 +
#* Lower box shipment status (back to Lesker) (Tim)
 
#* Testing in ESB
 
#* Testing in ESB
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Sep_24_2018.pdf Mirror box laser alignment] (Bill)
+
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_08_2018.pdf Mirror box laser alignment] (Bill)
 
#* Installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf]
 
#* Installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf]
 
# DAQ integration
 
# DAQ integration
Line 31: Line 33:
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
#* LED generator (Yunjie)
+
#* LED generator ([https://halldweb.jlab.org/wiki/images/4/41/LED_100818.pdf Yunjie])
#* Time-based studies (Maria)
+
#* Time-based studies ([https://gluexdirc.mit.edu/sim-update-1 Maria])
 +
#* alignment updates (Cris)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# [[Addressing ERR review recommendations]]
 
# [[Addressing ERR review recommendations]]
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
# AOB
 
# AOB

Latest revision as of 13:27, 8 October 2018

Meeting Information

GlueX DIRC Meeting
Monday October 8, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • JLab management still deciding how to make up lost time this Fall
    • Preliminary plan from Hall D at CM: CompCal is priority for Fall, but continue with DIRC installation in parallel
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Mirror boxes delivered to JLab! (Ernie)
      • Warping of window flange and plan to address at Lesker (Ernie/Tim)
      • Dark box enclosure (Jason)
      • Quartz window (with modified flange) (Ernie)
    • Lower box shipment status (back to Lesker) (Tim)
    • Testing in ESB
    • Installation schedule: [2]
  3. DAQ integration
  4. Slow controls
  5. Software/simulations
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
    • LED generator (Yunjie)
    • Time-based studies (Maria)
    • alignment updates (Cris)
    • Software overview and tasks (All)
  6. Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  7. AOB