Difference between revisions of "October 8, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday October 8, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...")
 
(Agenda)
Line 20: Line 20:
 
# Optical box
 
# Optical box
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
#** Optical box
+
#** Warping of window flange and plan to address at Lesker (Ernie/Tim)
 
#** Mirror boxes delivered to JLab! (Ernie)
 
#** Mirror boxes delivered to JLab! (Ernie)
 
#** Dark box enclosure (Jason)
 
#** Dark box enclosure (Jason)

Revision as of 11:54, 5 October 2018

Meeting Information

GlueX DIRC Meeting
Monday October 8, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Warping of window flange and plan to address at Lesker (Ernie/Tim)
      • Mirror boxes delivered to JLab! (Ernie)
      • Dark box enclosure (Jason)
      • Quartz window (with modified flange) (Ernie)
    • Testing in ESB
    • Installation schedule: [2]
  3. DAQ integration
  4. Slow controls
  5. Software/simulations
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
    • LED generator (Yunjie)
    • Time-based studies (Maria)
    • Software overview and tasks (All)
  6. Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  7. AOB