Line 18: Line 18:
 
** Install GEM?
 
** Install GEM?
 
** BCAL/FDC chiller swap
 
** BCAL/FDC chiller swap
 +
** Air compressor relief test
 
* Hall D current Tasks  
 
* Hall D current Tasks  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication

Revision as of 09:53, 28 October 2022

Meeting Time and Place =

Friday October 28, 2022 9:30am TED 2559 and Teams

Agenda

  • Safety - pressure safety
  • All appraisals completed by Thanksgiving!
    • Self assessments due today
    • Update Individual Career Profile
  • Physics all hands meeting December 6
  • January Schedule 3rd-14th
    • Get DIRC operational
      • Install new .o25 orifice
    • Modify Tagger Microscope
    • Install New Profiler
    • Remove ComCal?
    • Install GEM?
    • BCAL/FDC chiller swap
    • Air compressor relief test
  • Hall D current Tasks
    • FCAL Insert Module fabrication
      • brass straps
      • matching mu metal to steel shields - 200 more to go
    • FCAL2 Design tidbits
      • Monitoring panel discussion - Stephanie
      • need cooling pipe to chiller assy
      • need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
      • need installation drawing
      • insert plexiglass, outer plexiglass
      • Tungsten
      • Insulation
      • Scaffolding on temporary platform
      • Electronic patch panels
      • Liftable frame mods
      • Cable trays
    • FCAL2 Assembly
      • Assemble FCAL2 step plates/cooling blocks - S&A
      • Epoxy fittings to Cooling Manifold
      • Weld water manifold supports
      • Bend/solder copper tubes - complete
      • Epoxy fittings to tubes
      • JBweld conductive epoxy tubes to blocks
      • HDList updates
    • KLONG dwgs
  • Controls - Bobby is responsible for PLC
  • General Maintenance
  • On Call -
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items