(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday October 22, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room...")
 
(Agenda)
 
(6 intermediate revisions by 3 users not shown)
Line 17: Line 17:
  
 
# Announcements
 
# Announcements
#* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running until 11/26
+
#* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running throughl 11/26
 
#* CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving
 
#* CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving
 
# Optical box
 
# Optical box
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
#** Window flange modification at Lesker (Ernie/Tim)
+
#** Box window flange modification at Lesker (Ernie/Tim)
 +
#*** Box received by Lesker last Tuesday, 11/16
 
#** Dark box enclosure: fabrication and testing (Jason)
 
#** Dark box enclosure: fabrication and testing (Jason)
 
#** Quartz window (with modified flange) (Ernie)
 
#** Quartz window (with modified flange) (Ernie)
Line 27: Line 28:
 
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_08_2018.pdf Mirror box laser alignment] (Bill)
 
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_08_2018.pdf Mirror box laser alignment] (Bill)
 
#* Testing in EEL 226
 
#* Testing in EEL 226
#**  
+
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason]
 +
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_22_2018.pdf Cabling tests and plans for dark box tests]
 
# DAQ integration
 
# DAQ integration
 
# Slow controls
 
# Slow controls
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
#* LED generator (Yunjie)
+
#* LED generator ([https://halldweb.jlab.org/wiki/images/c/c2/LED_102218.pdf Yunjie])
#* Time-based studies (Maria)
+
#* Time-based studies (Maria [https://gluexdirc.mit.edu/sim-update-1 1] [https://gluexdirc.mit.edu/dirc-time-imaging-reco 2] [https://gluexdirc.mit.edu/dirc-time-imaging-reco-2-png 3])
 
#* Alignment updates (Cris)
 
#* Alignment updates (Cris)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)

Latest revision as of 13:08, 22 October 2018

Meeting Information

GlueX DIRC Meeting
Monday October 22, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Updated schedule from JLab management, full energy running throughl 11/26
    • CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving
  2. Optical box
  3. DAQ integration
  4. Slow controls
  5. Software/simulations
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
    • LED generator (Yunjie)
    • Time-based studies (Maria 1 2 3)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
  6. Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  7. AOB