Difference between revisions of "October 21, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
** assembly components - drawings released
 
** assembly components - drawings released
 
** Installation drawings in review
 
** Installation drawings in review
* Target Design in work [[image:cpp_target1.jpg|thumb]]
+
* Target Design in work [[image:cpp_target1.jpg|thumb]] [[image:cpp_target2.jpg|thumb]] [[image:cpp_target3.jpg|thumb]] [[image:cpp_target4.jpg|thumb]]
  
 
* Things to work out
 
* Things to work out

Revision as of 14:57, 21 October 2021

Meeting Time and Place

Thursday October 21, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_09,_2021_CPP_Design_Meeting
  • Testing status - Beni/Elton
  • Design/Fab/Procurement status
    • Lead absorbers - out for bid
    • All assembly hardware wither here or due in by December
    • Stand All parts here -assembled in the TEDF High bay
      Cpp stand 5.jpg
    • Steel - all received
      Cpp steel 3.jpg
  • Installation/assy 3D Model and dwgs
    • DS Chamber orientation?
    • Scintillator orientation?
    • assembly components - drawings released
    • Installation drawings in review
  • Target Design in work
    Cpp target1.jpg
    Cpp target2.jpg
    Cpp target3.jpg
    Cpp target4.jpg
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes and Action Items

Action Items