Difference between revisions of "October 14, 2021 KLONG Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Minutes)
Line 27: Line 27:
 
== Minutes ==
 
== Minutes ==
 
* Calcs for heating of Tungsten and Beryllium not completed yet - Igor to email Johan
 
* Calcs for heating of Tungsten and Beryllium not completed yet - Igor to email Johan
* Eugene asked about temperature sensors - need rad hard and put on copper plates
+
* Eugene asked about temperature sensors - Mark had some suggestions -need rad hard and put on copper plates
 
* Is 1mm aluminum window at exit of target ok? Should be
 
* Is 1mm aluminum window at exit of target ok? Should be
  

Revision as of 16:46, 27 October 2021

Meeting Time and Place

Thursday October 14, 2021, 1pm Bluejeans https://bluejeans.com/465620466

  • Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens, Johan Messchendorp

Agenda

Requirements and things to finalize

    • Cool tungsten plug to below temperature that affects lead (327°C)
    • 5 cm beam tube to PS and 6 cm to final target
    • Moveable out of beamline
    • Be 90% pure or better (price same for 98% pure)
    • Steel standoffs in bottom poly sheet
    • 1mm al window ok for collimator exit of target?
    • Beryllium sealing - ongoing discussions with RadCon
    • Existing 5cm lead and 1cm steel at collimator exit wall ok
    • 10 cm lead at both walls inside collimator cave
    • 10 cm distance from beryllium target to downstream vacuum window of.
    • Remove PS vacuum chamber and put in 6cm beampipe
    • 5 mm gap between beryllium and tungsten so heat does not transfer

Minutes

  • Calcs for heating of Tungsten and Beryllium not completed yet - Igor to email Johan
  • Eugene asked about temperature sensors - Mark had some suggestions -need rad hard and put on copper plates
  • Is 1mm aluminum window at exit of target ok? Should be

Action Items

  • Look for temp sensors - Keith/Tim
  • Complete heat calcs - Johan
  • Determine if 1mm aluminum window ok at exit of target - Igor
  • Continue working on drawing package - Keith