Difference between revisions of "October 10, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 23: Line 23:
 
#* Water system testing (Tim)
 
#* Water system testing (Tim)
 
#* Design and PMT mounting update (Ernie and Jason)
 
#* Design and PMT mounting update (Ernie and Jason)
#* Simulation studies (Maria and Roman)  ([https://web-docs.gsi.de/~rdzhigad/www/research/hitpatterns-hdgeant4 patterns with hdgean4])
+
#* Simulation studies (Maria and Roman)  ([https://web-docs.gsi.de/~rdzhigad/www/research/hitpatterns-hdgeant4 patterns with hdgeant4])
 
#* Electronics (Fernando)
 
#* Electronics (Fernando)
 
# Bar box transportation and monitoring  
 
# Bar box transportation and monitoring  

Revision as of 13:09, 10 October 2017

Meeting Information

GlueX DIRC Meeting
Tuesday October 10, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom)
    • Delivery and assembly status
  3. Nitrogen system in Hall (Tom)
  4. Optical box
    • Water system testing (Tim)
    • Design and PMT mounting update (Ernie and Jason)
    • Simulation studies (Maria and Roman) (patterns with hdgeant4)
    • Electronics (Fernando)
  5. Bar box transportation and monitoring
    • Preparations for 1st bar box shipment: Nov 1-3
    • Timeline discussion
  6. AOB