Difference between revisions of "November 18, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Action Items)
Line 36: Line 36:
  
 
==Action Items ==
 
==Action Items ==
* Remove scintillator paddles from Collimator cave (Mark S)
 
* Bring lead sheets to vendor (Mark S)
 
* Design stabilization for install of first assembly in Hall ( Stephanie)
 
* Test install some chambers on absorbers in TEDF (Mark S)
 
* Update 3D model with Elton's lates config. (Stephanie)
 
* Verify Cables from DS chamber clear the cable trays ( Stephanie)
 
* Work out plan with Nick on removing cables from vertical managers (Tim)
 
* Continue target design (Bobby)
 

Revision as of 15:19, 17 November 2021

Meeting Time and Place

Thursday November 18, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

File:Cpp install assy.pdf
  • Installation/assy 3D Model and dwgs
    • DS Chamber orientation
    • Scintillator orientation
    • assembly components - drawings released
    • Installation drawings in review
  • Target Design in work
    Cpp target1.jpg
    Cpp target2.jpg
    Cpp target3.jpg
    Cpp target4.jpg


  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes

Action Items