Line 12: Line 12:
 
** All assembly hardware wither here or due in by December
 
** All assembly hardware wither here or due in by December
 
** Test install in the TEDF High bay [[image:cpp_install_test.jpg|thumb]]  
 
** Test install in the TEDF High bay [[image:cpp_install_test.jpg|thumb]]  
** Absorber install [[image:cpp_install_test1.jpg|thumb]]
+
[[image:cpp_install_test1.jpg|thumb]]
 
* Installation/assy 3D Model and dwgs
 
* Installation/assy 3D Model and dwgs
 
** DS Chamber orientation?
 
** DS Chamber orientation?

Revision as of 14:34, 4 November 2021

Meeting Time and Place

Thursday November 02, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

Cpp install test1.jpg
  • Installation/assy 3D Model and dwgs
    • DS Chamber orientation?
    • Scintillator orientation?
    • assembly components - drawings released
    • Installation drawings in review
  • Target Design in work
    Cpp target1.jpg
    Cpp target2.jpg
    Cpp target3.jpg
    Cpp target4.jpg
    • 3cm bore ok?
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes

Action Items