Difference between revisions of "Monitoring: Outline of Tasks and Issues"
From GlueXWiki
(some amplification) |
|||
Line 9: | Line 9: | ||
### relevant IT systems | ### relevant IT systems | ||
### relevant Facilities Management systems | ### relevant Facilities Management systems | ||
+ | # Beyond scope: what should be done by other means | ||
+ | ## Safety | ||
+ | ### Personnel | ||
+ | ### Equipment | ||
+ | ## Beam time accounting | ||
+ | ## Personnel training/certification/qualification | ||
+ | ## Shift-taking accounting | ||
# Types of data: how is the data presented | # Types of data: how is the data presented | ||
## Event based: in the data stream | ## Event based: in the data stream | ||
### Triggered detector events | ### Triggered detector events | ||
### Special events | ### Special events | ||
− | ## Slow controls: on-demand, small volume | + | ## Slow controls: on-demand (usually), small data volume |
### EPICS or EPICS-like | ### EPICS or EPICS-like | ||
### stand-alone systems | ### stand-alone systems | ||
Line 36: | Line 43: | ||
## Archiver (database fillers) | ## Archiver (database fillers) | ||
## Logbook | ## Logbook | ||
+ | # Time-scales | ||
+ | ## Real time | ||
+ | ## Minute-by-minute | ||
+ | ## Hourly | ||
+ | ## Every shift | ||
+ | ## Every day | ||
+ | ## Weekly | ||
+ | ## Monthly | ||
+ | ## Run period | ||
+ | ## Annually |
Revision as of 16:17, 3 April 2008
- Scope: what to monitor and why
- Online and near-online
- Provide feedback to insure data quantity and quality
- All releveant areas:
- GlueX Detector
- Detector electronics
- Hall D systems
- relevant Accelerator systems
- relevant IT systems
- relevant Facilities Management systems
- Beyond scope: what should be done by other means
- Safety
- Personnel
- Equipment
- Beam time accounting
- Personnel training/certification/qualification
- Shift-taking accounting
- Safety
- Types of data: how is the data presented
- Event based: in the data stream
- Triggered detector events
- Special events
- Slow controls: on-demand (usually), small data volume
- EPICS or EPICS-like
- stand-alone systems
- Web-based variables
- Monitoring applications
- Event based: in the data stream
- Audience: who wants to know
- Counting room personnel
- Accelerator personnel
- Detector and systems experts
- Collaboration
- On-site
- Off-site
- General public
- Presentation: how to access the data
- Histograms
- Strip charts
- Web pages
- Desktop applications
- Audible alarms
- Monitoring data collection programs: automated data consumers
- Alarm handlers
- Archiver (database fillers)
- Logbook
- Time-scales
- Real time
- Minute-by-minute
- Hourly
- Every shift
- Every day
- Weekly
- Monthly
- Run period
- Annually