May 10, 2017, Production & Analysis Working Group

From GlueXWiki
Revision as of 13:57, 9 May 2017 by Tbritton (Talk | contribs) (This Week's Topics)

Jump to: navigation, search

Meeting Time and Place

The meeting will be on Wednesday May 10, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  1. Announcements
  2. Collaboration Meeting May 15-17, 2017
  3. Data Production
  4. Analysis Focus
  5. This Week's Studies
  6. Any other studies
  7. Upcoming Study Schedule

This Week's Topics

  • Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • Talks should be limited to 10 + 5 minutes.

Data Production

  1. Monitoring Update --- Thomas Britton
  2. Calibration Update --- Sean Dobbs
  3. Preparing for the last Spring 2016 production launch
  4. Preparing for the first Spring 2017 production launch
  5. Processing Update --- Alex Austregesilo

Analysis Focus: Total Cross Sections

  1. J/Ψ, φ --- Lubomir
  2. η, ρ, ω, φ --- Simon
  3. [2] φ --- Thomas
  4. ω --- Christiano
  5. Any others?

Alignment & Track/Shower Efficiencies

(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.

  1. Drift chamber alignment --- Mike Staib
  2. Tracking Efficiencies --- Paul Mattione
  3. BCAL Shower Efficiencies --- Elton Smith
  4. FCAL Shower Efficiencies --- Jon Zarling

Data Production Milestones

  1. Produce Spring 2016 "gold runs" as soon as alignment is ready
  2. Mon. May 8 -- Fri. May 12 (?) - Scicomp tape library down
  3. Mon. May 14 - Fri. May 19 - Finalize calibrations/software for 2017 data. Run final tests.
  4. Mon. May 21 - Start production of 2017 data.
    • Two groups: low-rate and high-rate data.

Upcoming Study Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.

Next Week: Studies: Other Updates on experiment, simulation, and the comparison between the two.

  1. Track / Hit Matching: BCAL, FCAL, TOF, SC --- Paul Mattione, Simon
  2. Efficiencies: TOF, SC --- Beni, Mahmoud
  3. Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
  4. Uncertainties: PID (BCAL, FCAL, TOF, dE/dx), Kinfit (BCAL, FCAL, tracking)
  5. Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
  6. Other reconstruction/analysis issues

Week after next: Studies: Beamline & Triggering

  1. Flux --- Justin
  2. Beam energy --- Beamline Group
  3. Polarization (TPOL & lineshape) --- Beamline Group
  4. Beam Asymmetries --- Alex Austregesilo
  5. Trigger emulation --- Alex Somov
  6. Triggering efficiency --- Alex Somov

The following week: Studies: Hit Efficiencies (i.e. Is the detector working?) Updates on experiment, simulation, and the comparison between the two.

  1. CDC Hit Efficiencies --- Naomi Jarvis
  2. FDC Hit Efficiencies --- Alex Austregesilo
  3. BCAL Hit Efficiencies --- Elton Smith
  4. FCAL Hit Efficiencies --- Jon Zarling