Difference between revisions of "March 5, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 29: Line 29:
 
#* Implementing realistic efficiency/time resolution in MC (Justin)
 
#* Implementing realistic efficiency/time resolution in MC (Justin)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
#* Adding # photons to LUT likelihood (Maria)
+
#* Adding # photons to LUT likelihood - N pho raw (Maria)
 
#* Alignment updates (Cris)
 
#* Alignment updates (Cris)
 
#* Requests for simulations: what samples, how much statistics, etc.?
 
#* Requests for simulations: what samples, how much statistics, etc.?
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# AOB
 
# AOB

Revision as of 14:01, 5 March 2019

Meeting Information

GlueX DIRC Meeting
Tuesday March 5, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation planning:
    • Window for upper box being polished and frame order has been submitted
    • Plans for tests with LED fibers and canullas (Bill/Fernando ) 2
    • Plans for making bar boxes light tight (All)
  3. Spring 2019 DIRC Commissioning (All)
    • Status of REST file processing (dirc_monitoring/ver08)
    • LED data analysis and comparison to laser test stand data (Bill/Andrew)
    • List of beam/detector conditions and studies planned
    • Plans for timing calibrations, etc. before next reconstruction pass over data
  4. Software/simulations
    • Implementing realistic efficiency/time resolution in MC (Justin)
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • Adding # photons to LUT likelihood - N pho raw (Maria)
    • Alignment updates (Cris)
    • Requests for simulations: what samples, how much statistics, etc.?
  5. Software overview and tasks (All)
  6. AOB