Difference between revisions of "March 4, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 12: Line 12:
 
*** Gas - Scot
 
*** Gas - Scot
 
** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
 
** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
 +
** FDC and Target heat exchanger - Josh
 
** PS Parasitic Detectors stages  
 
** PS Parasitic Detectors stages  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication

Latest revision as of 11:26, 4 March 2022

Meeting Time and Place =

Friday March 4, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - MEDCON status
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move - Bobby
      • Moveable Lead absorber
      • Target -
      • Gas - Scot
    • Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
    • FDC and Target heat exchanger - Josh
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • Honing test a few steel shields
      • Sasha wants help matching mu metal to steel shields
    • Tagger NMR repair - Scot
    • FDC chiller repair - Josh
    • BCAL Coldshot Chiller commissioning - Josh
    • Target Turbo repair - Keith
    • TEDF move in late April to EEL stockroom area
  • JT file creation
  • FCAL Insert Drawings
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Chris
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for CPP install HDList