## Elton gave an update on CPP. Things are proceeding ok: company has the cable crimper and a set of 6 cables are expected next week; noise studies continue; trigger work is pending, fibres to crate to be installed, etc.
 
## Elton gave an update on CPP. Things are proceeding ok: company has the cable crimper and a set of 6 cables are expected next week; noise studies continue; trigger work is pending, fibres to crate to be installed, etc.
 
# Run Operations
 
# Run Operations
## FCAL
+
## FCAL: no report.
 
## BCAL: Mark reported that the backwards wiring on one of the BCAL chillers (caused the flow to go in reverse) has been fixed.
 
## BCAL: Mark reported that the backwards wiring on one of the BCAL chillers (caused the flow to go in reverse) has been fixed.
## CCAL
+
## CCAL: no report.
 
# Calibration: Mark is working on the low-level BCAL constants (position calibration) for SRC and when done will send the numbers to Stjepan.  Stjepan asked about a PrimEx launch and Mark replied that it will be done soon.
 
# Calibration: Mark is working on the low-level BCAL constants (position calibration) for SRC and when done will send the numbers to Stjepan.  Stjepan asked about a PrimEx launch and Mark replied that it will be done soon.
 
# Monitoring
 
# Monitoring
 
## BCAL (offline) - ('Verbal only': Tolga first look at ver06 Batch 1/2) for runs in the 80,000 series. Things look mostly nominal with a few small issues that are being investigated.  Elton asked about "noisy plots" and Mark answered that these are for MT target runs and are not really visible with full target; anyhow, the random triggers in the MC handles them ok.
 
## BCAL (offline) - ('Verbal only': Tolga first look at ver06 Batch 1/2) for runs in the 80,000 series. Things look mostly nominal with a few small issues that are being investigated.  Elton asked about "noisy plots" and Mark answered that these are for MT target runs and are not really visible with full target; anyhow, the random triggers in the MC handles them ok.
## FCAL (offline)
+
## FCAL (offline): no report; Susan sent regrets (at JFurture meeting).
## CCAL (offline)
+
## CCAL (offline): no report.
 
# Reconstruction: Churamani reported that he continues to review the eta-prime invariant mass resolution and the dip in the efficiency as a function of theta_gamma. He plans to report after the APS meeting/
 
# Reconstruction: Churamani reported that he continues to review the eta-prime invariant mass resolution and the dip in the efficiency as a function of theta_gamma. He plans to report after the APS meeting/
 
# Simulations: no report.
 
# Simulations: no report.
 
# Any other business: Mark will book a room at JLab for these CALWG meetings so that locals can gather there.
 
# Any other business: Mark will book a room at JLab for these CALWG meetings so that locals can gather there.

Latest revision as of 11:57, 30 March 2022

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Use ZoomGov: https://jlab-org.zoomgov.com/j/1608552106?pwd=UE1nZFIzUUZHVjJEVGJXTGdUYTV3UT09.
Our meeting ID number is 160 855 2106. Click "Expand" for more details.

  • Meeting ID: 160 855 2106 Passcode: 944454
  • One tap mobile
       +16692545252,,1608552106# US (San Jose)
       +16468287666,,1608552106# US (New York)
  • Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 551 285 1373 US
       +1 669 216 1590 US (San Jose)
       833 568 8864 US Toll-free
       161.199.138.10 (US West)
       161.199.136.10 (US East)
       Meeting ID: 160 855 2106
       Passcode: 944454

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. CCAL HDCCAL log book
  4. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  5. Photon Reconstruction Task Force
  6. BCAL calibration links, 2020, PrimEx, SRC

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Shutdown tasks
    1. Review Action Items
  4. Run Operations
    1. FCAL
    2. BCAL
    3. CCAL
  5. Calibration
  6. Monitoring
    1. BCAL (offline) - ('Verbal only': Tolga first look at ver06 Batch 1/2)
    2. FCAL (offline)
    3. CCAL (offline)
  7. Reconstruction
  8. Simulations
  9. Any other business

Minutes

Attendees: Mark, Tolga, Stjepan, Elton, Churamani, Farah (Bonn), Karthik, Malte, Jon, Eugene, Zisis

  1. Announcements: none.
  2. Past Meeting Minutes
    1. We reviewed the minutes from the past two meetings briefly. Mark is studying the FCAL voltages and will report quantitatively soon, and for now his proposal is leaning towards modifying the voltage of the PMTs. Some max out, so for those Mark is thinking to have them replaced with 40 other ones (mostly in central region).
  3. Shutdown tasks
    1. Review Action Items: skipped.
    2. Elton gave an update on CPP. Things are proceeding ok: company has the cable crimper and a set of 6 cables are expected next week; noise studies continue; trigger work is pending, fibres to crate to be installed, etc.
  4. Run Operations
    1. FCAL: no report.
    2. BCAL: Mark reported that the backwards wiring on one of the BCAL chillers (caused the flow to go in reverse) has been fixed.
    3. CCAL: no report.
  5. Calibration: Mark is working on the low-level BCAL constants (position calibration) for SRC and when done will send the numbers to Stjepan. Stjepan asked about a PrimEx launch and Mark replied that it will be done soon.
  6. Monitoring
    1. BCAL (offline) - ('Verbal only': Tolga first look at ver06 Batch 1/2) for runs in the 80,000 series. Things look mostly nominal with a few small issues that are being investigated. Elton asked about "noisy plots" and Mark answered that these are for MT target runs and are not really visible with full target; anyhow, the random triggers in the MC handles them ok.
    2. FCAL (offline): no report; Susan sent regrets (at JFurture meeting).
    3. CCAL (offline): no report.
  7. Reconstruction: Churamani reported that he continues to review the eta-prime invariant mass resolution and the dip in the efficiency as a function of theta_gamma. He plans to report after the APS meeting/
  8. Simulations: no report.
  9. Any other business: Mark will book a room at JLab for these CALWG meetings so that locals can gather there.