Difference between revisions of "June 3, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
# Optical box design update (MIT)
 
# Optical box design update (MIT)
 
#* [https://gluexdirc.mit.edu/window-check window for the optical box]
 
#* [https://gluexdirc.mit.edu/window-check window for the optical box]
 +
#* update about the cookies
 
# [https://halldweb.jlab.org/wiki/index.php/File:Kde_map.pdf Preliminary Kinematics Scan]
 
# [https://halldweb.jlab.org/wiki/index.php/File:Kde_map.pdf Preliminary Kinematics Scan]
 
# Support structure design update (IU)
 
# Support structure design update (IU)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Revision as of 10:51, 3 June 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, June 3, 2016
11 am, EDT
JLab room F224

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box design update (MIT)
  3. Preliminary Kinematics Scan
  4. Support structure design update (IU)
  5. Planning for FY16
  6. AOB