Difference between revisions of "June 22, 2022 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 65: Line 65:
 
# Calibration
 
# Calibration
 
#* [https://halldweb.jlab.org/wiki/index.php/File:InnerBlocks_30730-20220425.png Revisiting calibration of GlueX-I data]
 
#* [https://halldweb.jlab.org/wiki/index.php/File:InnerBlocks_30730-20220425.png Revisiting calibration of GlueX-I data]
 +
### Update on the status of the SRC and PrimEx BCAL calibrations (Stjepan) [https://halldweb.jlab.org/DocDB/0056/005663/001/Spring_Summer%202022%20Pi0%20BCAL%20Gain%20Callibration.pdf]
 
# Monitoring
 
# Monitoring
 
## BCAL LED
 
## BCAL LED

Revision as of 11:08, 22 June 2022

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Use ZoomGov: https://jlab-org.zoomgov.com/j/1608552106?pwd=UE1nZFIzUUZHVjJEVGJXTGdUYTV3UT09.
Our meeting ID number is 160 855 2106. Click "Expand" for more details.

  • Meeting ID: 160 855 2106 Passcode: 944454
  • One tap mobile
       +16692545252,,1608552106# US (San Jose)
       +16468287666,,1608552106# US (New York)
  • Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 551 285 1373 US
       +1 669 216 1590 US (San Jose)
       833 568 8864 US Toll-free
       161.199.138.10 (US West)
       161.199.136.10 (US East)
       Meeting ID: 160 855 2106
       Passcode: 944454

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. CCAL HDCCAL log book
  4. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  5. Photon Reconstruction Task Force
  6. BCAL calibration links, 2020, PrimEx, SRC

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Shutdown tasks
    1. Review Action Items
  4. Run Operations
    1. FCAL under FCAL calibration -> CPP FCAL time/energy calibrations under
      1. Gain matching calibration plots
      2. Timing calibration
    2. BCAL
    3. CCAL
  5. Calibration
      1. Update on the status of the SRC and PrimEx BCAL calibrations (Stjepan) [1]
  6. Monitoring
    1. BCAL LED
      1. Update-cpp (Varun)[2]
    2. BCAL (offline)
      1. Brief update, Hadronic Efficiencies plots for Version 7 Monitoring, Tolga [3]
    3. FCAL (offline)
      1. FCAL Timing Resolution (Kevin)[4]
    4. CCAL (offline)
  7. Reconstruction
    1. BCAL efficiency: Churamani [5]
  8. Simulations
  9. Any other business

Minutes

Attendees: