Difference between revisions of "June 14, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(4 intermediate revisions by 4 users not shown)
Line 18: Line 18:
 
# Announcements
 
# Announcements
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 +
#** Practice talks Monday @ 1:30 pm
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23]
 
# Bar box transportation and installation (Tim, Mark)
 
# Bar box transportation and installation (Tim, Mark)
 
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt)
 
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt)
#* Lessons learned for upper bar box installation (Tim)
+
#* [[Media:BARBOX_Lessons_Learned.pdf|Lessons Learned]] for upper bar box installation (Tim)
 
# Optical box
 
# Optical box
 
#*Status update (Ernie and Jason)
 
#*Status update (Ernie and Jason)
 
#** Box production at Lesker
 
#** Box production at Lesker
#** PMT test fixture and cookies ([https://gluexdirc.mit.edu/red-bracket-tests-2 Maria])
+
#** PMT test fixture and cookies ([https://gluexdirc.mit.edu/red-bracket-tests-2 Maria] [https://gluexdirc.mit.edu/red-bracket-tests-3 and this])
 
#** Window procurement
 
#** Window procurement
 
#** Dark box conceptual design
 
#** Dark box conceptual design
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]]Installation schedule
+
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]]
 
# Simulation studies (Maria and Roman)
 
# Simulation studies (Maria and Roman)
# MAPMT testing (Bill)
+
# [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_June_14_v2.pdf MAPMT testing] (Bill)
 
# AOB
 
# AOB

Latest revision as of 10:14, 14 June 2018

Meeting Information

GlueX DIRC Meeting
Thursday June 14, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Bar box transportation and installation (Tim, Mark)
  3. Optical box
  4. Simulation studies (Maria and Roman)
  5. MAPMT testing (Bill)
  6. AOB