Difference between revisions of "July 15, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 9: Line 9:
 
* OSP/Testing status - Beni
 
* OSP/Testing status - Beni
 
* DS chamber clearance
 
* DS chamber clearance
** [[media:cpp_HVwire.pdf]]
+
** [[Image:cpp_HVwire.pdf|thumb]]
** [[media:cpp_bolt.pdf]]
+
** [[Image:cpp_bolt.pdf|thumb]]
 
* Design/Fab/Procurement status
 
* Design/Fab/Procurement status
 
** Installation/assy dwgs
 
** Installation/assy dwgs

Revision as of 15:11, 15 July 2021

Meeting Time and Place

Thursday July 15, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/July_01,_2021_CPP_Design_Meeting
  • OSP/Testing status - Beni
  • DS chamber clearance
    • Cpp HVwire.pdf
    • Cpp bolt.pdf
  • Design/Fab/Procurement status
    • Installation/assy dwgs
    • Stand
    • Steel
    • Fcal platform mods
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes and Action Items