Difference between revisions of "July 15, 2015 Calibration"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 54: Line 54:
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2775 GlueX-doc-2775]
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2775 GlueX-doc-2775]
 
# Subdetector Reports
 
# Subdetector Reports
 +
#*[[Media:PS-energy-calib-2015-07-15.pdf|Inital PS energy calibration results - Alex B.]]
 
# [[Spring_2015_Commissioning_Simulations|Simulations]]
 
# [[Spring_2015_Commissioning_Simulations|Simulations]]
 
# Action Item Review
 
# Action Item Review

Revision as of 11:30, 15 July 2015

GlueX Calibration Meeting
Wednesday, July 15, 2015
11:00 am, EDT
JLab: CEBAF Center, F326

Communication Information

Remote Connection

You can connect using BlueJeans using the meeting number 630 804 895 .       (Click "Expand" to the right for more details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 630804895
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above
    • Use *4 to unmute

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2015 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2015/ .

Agenda

  1. Announcements
  2. Calibration Processing
    • Potential uses of git?
    • Run quality criteria
  3. Summary of Detector Performance
  4. Subdetector Reports
  5. Simulations
  6. Action Item Review
  7. AOB

Action Items

  • Produce updated calibration plots and performance numbers, preferably within a week.
  • Polish calibration routines, including testing of results, documentation (GlueX note).
  • Update simulation parameters.