Difference between revisions of "January 3, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 8: Line 8:
 
* Accelerator SAD Scedule
 
* Accelerator SAD Scedule
 
* Hall D SAD Tasks
 
* Hall D SAD Tasks
** CPP INstall  
+
** CPP INstall O:\halld_engineering\Installation Schedules
 
** Solenoid Warm Up/Cool Down - Start tomorrow
 
** Solenoid Warm Up/Cool Down - Start tomorrow
 
** Solenoid vacuum Turbo addition
 
** Solenoid vacuum Turbo addition

Latest revision as of 11:49, 3 January 2022

Meeting Time and Place

Monday January 03, 2022 at 11:00 am Hall D Counting House Bluejeans https://bluejeans.com/465620466

Agenda

  • Safety - Flooding/Snow media:Flood1.jpg
    Flood2.jpg
    Flood3.jpg
  • Accelerator SAD Scedule
  • Hall D SAD Tasks
    • CPP INstall O:\halld_engineering\Installation Schedules
    • Solenoid Warm Up/Cool Down - Start tomorrow
    • Solenoid vacuum Turbo addition
    • Goniometer Maintenance/Diamonds?
    • PS Parasitic Detectors stages?
    • DIRC Ressurection
    • FCAL Insert Module fabrication
    • General Maintenance
  • On Call - Josh
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  •  ?