Line 12: Line 12:
 
** Igal is cutting Tedlar and Kapton
 
** Igal is cutting Tedlar and Kapton
 
** Some backlog with brazing straps, communicated with Tim and Mark regarding getting Chris more involved.
 
** Some backlog with brazing straps, communicated with Tim and Mark regarding getting Chris more involved.
** Quite a few mu-metal housings are tight (no space for kapton film)  have to be 'polished', met with Tim
+
** Quite a few soft iron housings are tight (no space for kapton film)  have to be 'polished', met with Tim
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)

Latest revision as of 00:11, 11 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped more than 200 ESR foils, had a meeting today regarding wrapping crystals
    • Olga visited JLab: prepared 3 sets of Silicon cookies and tested diameter of about 300 PMTs
    • Igal is cutting Tedlar and Kapton
    • Some backlog with brazing straps, communicated with Tim and Mark regarding getting Chris more involved.
    • Quite a few soft iron housings are tight (no space for kapton film) have to be 'polished', met with Tim
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations

Minutes

Attendees: Bill,Igal,Arshak,Phil,Sasha,Tim W.,Olga,Jon,Liping,Jane,Azizah

  • Detector support group has been preshaping ESR foils and about to start wrapping crystals
  • Olga prepared cookies and checked PMT diameters
  • PMTs that don't meet our tolerance spec exchanged with NPS
  • Sasha ordered 3 more fixtures for cookie prep
  • Loan agreement with GWU to be approved soon, also need contract with GWU
  • GWU could also help with light guides, cutting foils, divider tests
  • 1510 PMTs in total expected from Hamamatsu + 140 in COMCAL
  • Module fabrication continues, now have 115 completed as of the meeting
  • Liping was contacted by a former student interested in machine learning
    • Igal has a potential project 5