Difference between revisions of "JEF meeting, March 18, 2022"
From GlueXWiki
(Created page with "=Meeting time and location= *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142...") |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
+ | ** DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day) | ||
+ | ** Igal started cutting ESR foils needed by the DSG | ||
+ | ** Loan agreement with the GWU has been signed. Olga is expected to come in the beginning of next week | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] |
Revision as of 22:06, 17 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day)
- Igal started cutting ESR foils needed by the DSG
- Loan agreement with the GWU has been signed. Olga is expected to come in the beginning of next week
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations