JEF meeting, March 11, 2022

From GlueXWiki
Revision as of 10:25, 11 March 2022 by Ijaegle (Talk | contribs) (Agenda)

Jump to: navigation, search

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
    • Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
    • Chris continues brazing brass strap assemblies
    • Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
    • Igal is cutting Tedlar, Kapton, and ESR foils
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations
  • FCAL2 Insert Efficiency in Phi -- Azizah