Difference between revisions of "JEF meeting, March 11, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Data analysis
 
* Data analysis
 +
** [https://halldweb.jlab.org/wiki/images/5/55/Glue-jefxd-igal-jaegle-11032022.pdf Project 5]
 
* Simulations
 
* Simulations
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah]
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah]

Revision as of 10:25, 11 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
    • Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
    • Chris continues brazing brass strap assemblies
    • Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
    • Igal is cutting Tedlar, Kapton, and ESR foils
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations
  • FCAL2 Insert Efficiency in Phi -- Azizah