Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
* COMCAL tests, TAC running, etc. | * COMCAL tests, TAC running, etc. | ||
* Data analysis | * Data analysis | ||
+ | ** [https://halldweb.jlab.org/wiki/images/5/55/Glue-jefxd-igal-jaegle-11032022.pdf Project 5] | ||
* Simulations | * Simulations | ||
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah] | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah] |
Revision as of 10:25, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
- Chris continues brazing brass strap assemblies
- Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
- Igal is cutting Tedlar, Kapton, and ESR foils
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah