Line 8: Line 8:
 
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
 
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
 
** Chris continues to make brass strap assemblies
 
** Chris continues to make brass strap assemblies
** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into the housing)  
+
** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings)  
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)

Revision as of 00:15, 11 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda