** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
 
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
 
** Chris continues to make brass strap assemblies
 
** Chris continues to make brass strap assemblies
** Bobby has started working on honing soft iron housing  
+
** Bobby has started working on honing soft iron housing (a few mu-metal  are tight (no space for kapton film)
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)

Revision as of 23:53, 10 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
    • Chris continues to make brass strap assemblies
    • Bobby has started working on honing soft iron housing (a few mu-metal are tight (no space for kapton film)
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations
  • FCAL2 Insert Efficiency in Phi -- Azizah