Difference between revisions of "JEF meeting, June 3, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Minutes)
 
(2 intermediate revisions by 2 users not shown)
Line 8: Line 8:
 
** [https://halldweb.jlab.org/wiki/images/0/01/Background_update_060322.pdf Background simulation update]-- Simon
 
** [https://halldweb.jlab.org/wiki/images/0/01/Background_update_060322.pdf Background simulation update]-- Simon
 
** [https://halldweb.jlab.org/wiki/images/9/94/Glue-jefxd-igal-jaegle-03022022.pdf eta to ggpi0 update] -- ig
 
** [https://halldweb.jlab.org/wiki/images/9/94/Glue-jefxd-igal-jaegle-03022022.pdf eta to ggpi0 update] -- ig
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5405 diphoton separation plots (files tagged as 'MAY30')] -- Tegan
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
** [https://halldweb.jlab.org/detectors/fcal2/budget/students1.xlsx Status of Summer Students (2022) ]
 
** [https://halldweb.jlab.org/detectors/fcal2/budget/students1.xlsx Status of Summer Students (2022) ]
Line 19: Line 20:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/5_6_22/modules_in_tedf_5_6_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/5_6_22/modules_in_tedf_5_6_22.jpg  Fabricated modules in TEDF ]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
Attendees: Sasha,Bill,Liping,Phil,Olga,Jon,Igal,Daniel,Tegan,Susan,Jane,Arshak,Jaden,Dax,Vadim,Jared,Adam,Gavin,S.T.
 +
* S.T. gave an update on simulation of the π0π0 background for η→π0γγ
 +
** Goal is to understand the shape and scale of the background
 +
** New generator genScalarRegge with parameters tuned to existing FCAL2 data
 +
** Use to estimate background for FCAL2 in anticipation of possible submission to PAC next year
 +
* Igal has been looking at shower seperations between π0 and bachelor γ for the golden JEF channel
 +
** Finds different distributions depending on how the decay post-processor evtgen is used
 +
** Some evidence that shower shape in Island Algorithm (IA) for lead glass blocks may not be correct
 +
** The default (DA) shower reconstruction algorithm does not work well when the showers are too close
 +
** The Island algorithm reproduces reasonably well the thrown separation when using the center-of-gravity (actually a fitted position)
 +
** The log-weighting method fails for close clusters for both algorithms, with a pronounced peak near zero separation for IA
 +
** Compared IA and default algorithm reconstruction of π0γγ relative to η→3π0 background
 +
*** Peak in simulation at η mass looks sharper for FCAL2 compared to FCAL1
 +
*** TOF veto reduces signal by factor of 4 but does suppress η→2γ peaking background
 +
* Tegan showed some shower separation plots from his di-photon studies
 +
** Confirmed poor performance of log-weighting method for position if the clusters are too close
 +
** IA works better than DA for center-of-gravity position method
 +
** Could in principle check IA using real data in CCAL following Ilya's scheme for mixing events used for PrimeX
 +
* No news regarding moving FCAL2 module fabrication setup to new building
 +
* Olga delivered a batch of cookies from GWU
 +
* PRs can now proceed:  PMT sockets, integrating sphere
 +
* Got permission to move CRYTUR crystals from JLab pool to us
 +
* Students now at lab working on various stages of module fabrication, encouraged to give updates at this meeting
 +
** Checked 112 NPS replacement (SICCAS) crystals for color, bubbles, dimensions
 +
** Work on wrapping, cutting ESR/Tedlar,etc.
 +
* Need to glue/wrap light guides (1127 needed)
 +
* Grand total of 459 modules fabricated

Latest revision as of 11:51, 6 June 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Sasha,Bill,Liping,Phil,Olga,Jon,Igal,Daniel,Tegan,Susan,Jane,Arshak,Jaden,Dax,Vadim,Jared,Adam,Gavin,S.T.

  • S.T. gave an update on simulation of the π0π0 background for η→π0γγ
    • Goal is to understand the shape and scale of the background
    • New generator genScalarRegge with parameters tuned to existing FCAL2 data
    • Use to estimate background for FCAL2 in anticipation of possible submission to PAC next year
  • Igal has been looking at shower seperations between π0 and bachelor γ for the golden JEF channel
    • Finds different distributions depending on how the decay post-processor evtgen is used
    • Some evidence that shower shape in Island Algorithm (IA) for lead glass blocks may not be correct
    • The default (DA) shower reconstruction algorithm does not work well when the showers are too close
    • The Island algorithm reproduces reasonably well the thrown separation when using the center-of-gravity (actually a fitted position)
    • The log-weighting method fails for close clusters for both algorithms, with a pronounced peak near zero separation for IA
    • Compared IA and default algorithm reconstruction of π0γγ relative to η→3π0 background
      • Peak in simulation at η mass looks sharper for FCAL2 compared to FCAL1
      • TOF veto reduces signal by factor of 4 but does suppress η→2γ peaking background
  • Tegan showed some shower separation plots from his di-photon studies
    • Confirmed poor performance of log-weighting method for position if the clusters are too close
    • IA works better than DA for center-of-gravity position method
    • Could in principle check IA using real data in CCAL following Ilya's scheme for mixing events used for PrimeX
  • No news regarding moving FCAL2 module fabrication setup to new building
  • Olga delivered a batch of cookies from GWU
  • PRs can now proceed: PMT sockets, integrating sphere
  • Got permission to move CRYTUR crystals from JLab pool to us
  • Students now at lab working on various stages of module fabrication, encouraged to give updates at this meeting
    • Checked 112 NPS replacement (SICCAS) crystals for color, bubbles, dimensions
    • Work on wrapping, cutting ESR/Tedlar,etc.
  • Need to glue/wrap light guides (1127 needed)
  • Grand total of 459 modules fabricated