Difference between revisions of "JEF meeting, June 24, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
** Fabricated modules: <span style="color:#FF0000"> Total 746 </span>  
 
** Fabricated modules: <span style="color:#FF0000"> Total 746 </span>  
 
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS]  
 
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS]  
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 37 CRYTUR], Remaining: 590
+
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 37 CRYTUR], Remaining: 442
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126]
  

Revision as of 08:46, 1 July 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

    • Students reports
  • Light Monitoring System -- Arshak

Minutes

Attendees: Bill,Sasha,Igal,Zisis,Arshak,Tegan,Liping,Jane,Jon,Azizah,Olga,Phil,S.T.

  • Igal gave an update on η→π0γγ
    • Currently using default algorithm for analysis while we work on improving the island algorithm
    • Included 2π0 background but most of the background after all cuts are applied is due to η→3π0 and η→2γ
      • Should also include other hadronic backgrounds Sasha included in original simulation for proposal
    • Extracted limit for B→π0γ using FCAL-2
      • Used +/-2.5σ mass window
      • Found worse limit by about an order of magnitude compared to proposal, but should recheck using criteria Liping used
  • For island algorithm would like to compare shower profile for insert to result of snake scan (real data from December 2019)
    • Need to take into account size of beam
  • Module fabrication continues with great assistance from undergraduates
    • Students working wrapping crystals, ESR jigs, etc. -- Brandyn gave a short update on their activities
    • We are still short ~180 crystals
    • Grand total up to 598 fabricated modules, 37 of which are CRYTUR crystals
    • Still have quality control issues with brazing of straps
    • Waiting for mu-metal, but no obvious bottlenecks right now (have enough mu-metal for 1 month of work)
    • Have additional 3D printed jigs for gluing light guides
  • Arshak gave an update on LMS development
    • Integrating sphere has arrived
    • Received 200 feat of fiber
    • To address issue of uniformity of light output over extent of plexiglas, tried reflective paint on edges and coating one side of plexiglas with gortex reflective material on small prototype
      • Looks more uniform but needs to be repeated with full scale prototype